Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13710627

- Product Categories
- Friendly Links
Information Name: | Jaw crusher, crusher Chaoyang, North mine Zhongcheng equipment |
Published: | 2015-05-27 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Y type spring cone crusher how to install a large cone crusher during the installation process, note the following: First, the flatness of the basal plane, try to make the base surface mounted to the foot at the same level, need to be checked prior to installation deal with. Second, vendors crushers are generally two ways: one is to provide all parts, one is providing most of the several assembly parts. If it is a full part, in accordance with the instructions before installing ministries leveling parts, then the sequence described in accord; if the assembly parts, it is better to install, as long as the moving cone is fitted into eccentric, and then fasten the adjustment sleeve portion, well spring it takes about three days. Third, after installing the host, and then install the main motor to keep the concentricity. Fourth, the lubrication oil station must be filled with oil, check the situation of each valve. Lubrication of this equipment is also very important, must wait until oil return stability, hydraulic stability of the re-boot. Fifth, we must pay attention to the disk drive before turning the roll crusher, and then start the rotation without exception. Shenyang North mine equipment Limited integrated at the factory will be detailed specification, including the installation sequence and hydraulic, electrical specifications, just follow the instructions for installation, a successful test is not a problem. 1, the hydraulic adjusting discharge opening, combined with user-friendly design, adjusted hydraulically adjusted when the nesting population size, simply button controls, both labor and easy, and can achieve stepless adjustment of large crusher, adjust high controllability. 2, single-cylinder hydraulic adjustment spindle vertebra, overall lift to regulate the discharge opening of purpose and resolve the side bar and the rack tilt damage the host of problems. 3, automatically adjust the working pressure of the hydraulic system, crushing cavity into the ultra-affordable inevitable crushing pressure on the material, pressure regulating system automatically starts, conduct relief to protect the crusher, the nesting population automatic zoom, so was not broken through the discharge port discharge machine, the purpose to protect the equipment. 4, quick replacement of wearing parts, consumable replacement time to save, through careful design and processing of joints, vertebrae between the bowl and fit solid, reliable 5, hydraulic operating pressure is low Symons crusher, Hydraulic system working pressure the entire device is relatively low (at night is not a high-pressure system) pressure on the hydraulic parts, and host smaller, more durable and stable hydraulic system, eliminating the fear of the hydraulic system of the sixth, convenient installation and transportation, because the machine advanced design, high efficiency, its volume and weight are small, which is lifting, transportation, replacement parts and low maintenance requirements. Jaw crusher, crusher Chaoyang, North mine Zhongcheng equipment from Shenyang North Mine Zhongcheng machinery Limited. Shenyang North Mine Zhongcheng equipment Limited (sybkzc.com) (www.sybkzcjq.com) strong, credible, in Shenyang, Liaoning province machining industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the public into Shenyang North mine equipment Limited and you hand in hand into the brilliant, for a better future! |
Admin>>>
You are the 25945 visitor
Copyright © GuangDong ICP No. 10089450, Shenyang North Mine Zhongcheng Machine Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 25945 visitor
Copyright © GuangDong ICP No. 10089450, Shenyang North Mine Zhongcheng Machine Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility