Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13710627

- Product Categories
- Friendly Links
Information Name: | Mill manufacturers, Shenyang North mine Zhongcheng equipment Limited, Tieling mill |
Published: | 2015-05-29 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Development of large-scale flotation machine ball mill liners currently, 50 m3 flotation machine (coal washing equipment equipment) in China has been rapid application, solve the technical problems of many companies and industries. Application of 50 m3 flotation machine total more than 200 units, involving non-ferrous metals, ferrous metals, non-metals, gold and solid waste utilization, etc. ball, creating greater economic benefits. 160 m3 successful development of large flotation machine, the overall strength of the flotation device, competitiveness and international influence further. 160 m3 and 130 m3 has been used as a number of the company's new large-scale concentrator device of choice. Many mining enterprises promote the use of mineral processing mill, and achieved good results. Learn mill operation preparation, start-up and shutdown sequence using a ball mill in place now with a lot of ceramic ball, but the first ball mill What precautions do you have? Here to explain: First, prepare ball before the operation: 1, check whether someone. 2, check whether the oil level is appropriate, add insufficient. 3. Check the ball filling ratio meets the requirements. 4. Check all parts are loose and reliably tighten. 5. Check the hole cover tightly secured reliably. 6, check and rectify the leak powder phenomenon. 7, the first test run or the long-term should be poured a small amount of lubricating oil after stop grinding, press the "jog" revolution, confirming that no abnormal phenomenon. 8, and related operations staff contact, allowing the signal to start after starting the mill. Second, the sequence starting mill: 1, the starting powder output device. 2, starting mill. 3, start the feeder. Third, the order of mill downtime: 1, stop feeding the machine. 2, stopped ball. Long-term stop grinding balls and materials should be emptied. 3, the material on the machine discharge after their stop. These are the preflight preparation, start-up and shutdown sequence. Mill manufacturers, Shenyang North mine Zhongcheng equipment Limited, Tieling ball from Shenyang North Mine Zhongcheng machinery Limited. Shenyang North Mine Zhongcheng equipment Limited (sybkzc.com) (www.sybkzcjq.com) Liaoning Shenyang, machining leaders, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, the maximum meet customer needs. North Mine in Shenyang Zhongcheng equipment Limited leadership with the staff warmly welcome all inquiries negotiations to create the Shenyang North Mine Zhongcheng equipment Limited a better future. |
Admin>>>
You are the 25945 visitor
Copyright © GuangDong ICP No. 10089450, Shenyang North Mine Zhongcheng Machine Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 25945 visitor
Copyright © GuangDong ICP No. 10089450, Shenyang North Mine Zhongcheng Machine Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility