Information Name: | Mill equipment | Dalian ball | Shenyang North Mine Zhongcheng |
Published: | 2015-06-01 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Jaw crusher installation should pay attention to what matters jaw broken machine load test: (1) Jaw Crusher continuous operation 2h, bearing temperature rise should not exceed 30 ℃; (2) Jaw Crusher All fasteners should be firm, not loose phenomenon; (3) flywheel, sheave smooth operation; (4) all friction jaw broken machine parts without scratches, chipping and grinding phenomenon, no unusual sound; adjusting means (5) jaw crusher machine nesting population should be able to to ensure that the nesting population adjustment range. Jaw Crusher load test when: (1) crusher or may not have a significant impact on cycle, percussion; (2) the maximum feed size should meet the design requirements; (3) continuous operation 8h, bearing temperature must not exceed 30 ℃ ; (4) the crusher capacity and product size should meet the design requirements; Room (5) Adjust the seat and the seat frame no shifting of the ear. Preparation before jaw broken machine use: (1) The joints carefully check whether there is enough thrust plate grease; (2) Carefully check all the fasteners are tightened; (3) double-check the belt is good. If it is found there is insecurity, should be replaced, when there is oil on the belt or pulley mill equipment, oil rag and wipe application; (4) Check guard is good. When there is insecurity found should be immediately removed; (5) Check whether the ore crushing cavity or debris. If ore or debris, then, must be clean in order to ensure that the crusher cavity start; (6) Check whether the return from the top bolt, spacer group is pressed, whether the T-bolts tightened. Start jaw crusher: (1) The examination proved normal circumstances each part of the machine before starting; (2) Jaw Crusher allows only start in the absence of load conditions; (3) Before starting, you must use a tone or Signal forewarned; (4) to start, if there is not a normal phenomenon, should stop immediately. To be identified and excluded irregularities planetary ball mill, crusher before restarting. Jaw Crusher production during use: (1) Jaw Crusher normal operation, only feed production; (2) the material should be crushed evenly added crusher cavity should be filled to avoid lateral feed or feed beneficiation mill, so as not to overload or subjected to unilateral overload; (3) work, bearing temperature rise should not exceed 30 ℃, the maximum temperature not exceed 70 ℃. When exceeding the temperature, should be immediately stopped, identify and eliminate the cause. (4) before stopping, you should first stop feeding until after the crushing cavity material is fully discharged before power is turned off; (5) crushing, crushing cavity as a result of blockages caused by parking a ball mill, should immediately turn off the power to stop running, The crushing cavity clean material only after the re-start; (6) After the end of the jaw wear can turn around and use; (7) Jaw Crusher after a period of time, should bear the hub again tightened to prevent adapter sleeve is loose and damage the machine. Jaw crusher has a lot of precautions in the installation, use and maintenance - more reasonable care and maintenance equipment not only can significantly reduce the failure rate of the equipment, but also safe and effective protection of the operator and extended equipment life. Mill equipment | Dalian ball | Shenyang North Mine congregation into a congregation from Shenyang North mine equipment Limited. Shenyang North Mine Zhongcheng equipment Limited (sybkzc.com) (www.sybkzcjq.com) strong, credible, in Shenyang, Liaoning province machining industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the public into Shenyang North mine equipment Limited and you hand in hand into the brilliant, for a better future! |
Admin>>>
You are the 25945 visitor
Copyright © GuangDong ICP No. 10089450, Shenyang North Mine Zhongcheng Machine Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 25945 visitor
Copyright © GuangDong ICP No. 10089450, Shenyang North Mine Zhongcheng Machine Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility