Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13710627

- Product Categories
- Friendly Links
Information Name: | Swing feeder feeder _ _ North Mine Zhongcheng equipment |
Published: | 2015-06-02 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Drum washing machine installation, commissioning and commissioning 1. The machine shipped to the impeller feeder, the use of units should immediately check the parts are complete, damage. Determine the machine intact, before installation. 2. Use the unit should follow site-specific design foundation construction plans, the machine securely mounted on a solid concrete foundation. The machine must be installed as required to ensure that the inclination angle of figure 3. Install installation. The motor is mounted on the rail, in order to adjust the tightness of the belt, pulley and motor pulley should be installed to ensure parallel. 5. Adjust according to the above requirements, the rotor disk rotation a few turns to check for stuck collision phenomenon. After the drum washing machine empty load commissioning 1. Motor start operation of the machine should be smooth, no unusual vibrations. 2. The bearing temperature does not exceed 35 ℃. 3. idling time 2-4 hours reciprocating feeder, after the test machine, the entire check for loose connections, and adjustment. Drum washing machine load operation test 1. empty load test run on the basis of good, can only conduct load operation test. 2. The operation of the machine should be smooth, no unusual vibrations. 3. The bearing temperature does not exceed 40 ℃. 4. The seal may not have dust entering. 5. Determination of the actual power of the motor may not have abnormal fluctuations. 6. continuous load operation test required 5-6 hours, when the operation is recognized as a normal and correct to officially put into use. Drum washing machine before operating the machine 1. Boot swing feeder, all lubrication points must be checked if there is enough grease, connecting bolts must be tightened. 2. After starting the motor, must wait after normal operation can begin gradually feeding. 3. Stop before the operation must first stop feeding, after all material within the drum to be drained in order to stop the motor. 4. Check the inside of the drum should always wear welding spiral timely replacement, so as to avoid damage to the inner spiral drum and cause unnecessary losses. Drum washing machine is installed correctly is the prerequisite and basis for, the customer must under the guidance of my company's design drawings and site installation engineers were drum washing machine installation and testing it work better in the future. For more detailed information on installation issues and drawing drum washing machine, customers can contact us directly - we'll ask you a professional based on your actual situation and needs, feasible and efficient installation program. Swing feeder feeder _ _ North Mine Zhongcheng equipment from Shenyang North Mine Zhongcheng machinery Limited. Shenyang North Mine Zhongcheng equipment Limited (sybkzc.com) (www.sybkzcjq.com) strong, credible, in Shenyang, Liaoning province machining industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the public into Shenyang North mine equipment Limited and you hand in hand into the brilliant, for a better future! |
Admin>>>
You are the 25945 visitor
Copyright © GuangDong ICP No. 10089450, Shenyang North Mine Zhongcheng Machine Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 25945 visitor
Copyright © GuangDong ICP No. 10089450, Shenyang North Mine Zhongcheng Machine Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility