Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13710627

- Product Categories
- Friendly Links
- home > Supply > Buy dry magnetic separator | Shanghai dry magnetic separator | North Mine Zhongcheng
Information Name: | Buy dry magnetic separator | Shanghai dry magnetic separator | North Mine Zhongcheng |
Published: | 2015-06-19 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Preparation of aerated concrete material relationship with aerated concrete feed mill in the most important equipment is the ball, rotating cylinder in the process, the grinding media have dropped the phenomenon, in the fall during the feed material to the abrasive action, in order to effectively utilize abrasive effect, end the material for grinding steel, grinding the material passing discharged from the discharge end of the hollow shaft, small particles of feed material were finely ground when the machine is a horizontal cylinder rotating mechanism, outer gear, the two positions, lattice-type ball mill. Built with different specifications steel ball, rotating cylinder produces centrifugal force to the ball a certain height After the fall, have severe impact on the material and abrasive. The material in the first position coarse grinding, the material to further grinding. Powder is discharged through the discharge grate plate to complete the grinding operation. Only material to the required fineness of grinding and only after mixing interaction, in order to make products to strength, grinding production of aerated concrete is an important program, a ball mill is a horizontal simplified, dry magnetic separator price, composition out of the hollow shaft and grinding head and other parts, simplified for the long cylinder, to be selected according to the particle size of milled material, material from the mill feed end of the hollow shaft into the cylinder body, when the ball is rotated Simplified time, due to inertia and grinding centrifugal force, small dry magnetic separator, friction force, making it near post was taken away on a cylinder liner cylinder, ball mill used by the feeder evenly into the mill first into the compound by the air shaft spiral a warehouse, the warehouse has ladder liner or corrugated liner, built with different specifications steel ball, rotating cylinder produces centrifugal force to the ball a certain height After the fall, have severe impact on the material and abrasive. Drum washing machine load operation test 1. empty load test run on the basis of good, dry magnetic separation machine model, can only conduct load operation test. 2. The operation of the machine should be smooth, no unusual vibrations. 3. The bearing temperature does not exceed 40 ℃. 4. The seal may not have dust entering. 5. Determination of the actual power of the motor may not have abnormal fluctuations. 6. continuous load operation test required 5-6 hours, Liaoning dry magnetic separator, when the operation is recognized as a normal and correct to officially put into use. Drum washing machine before operating the machine 1. Boot, all lubrication points must be checked if there is enough grease, connecting bolts must be tightened. 2. After starting the motor, must wait after normal operation can begin gradually feeding. 3. Stop before the operation must first stop feeding, after all material within the drum to be drained in order to stop the motor. 4. Check the inside of the drum should always wear welding spiral timely replacement, so as to avoid damage to the inner spiral drum and cause unnecessary losses. Drum washing machine is installed correctly is the prerequisite and basis for, the customer must under the guidance of my company's design drawings and site installation engineers were drum washing machine installation and testing it work better in the future. For more detailed information on installation issues and drawing drum washing machine, customers can contact us directly - we'll ask you a professional based on your actual situation and needs, feasible and efficient installation program. Buy dry magnetic separator | Shanghai dry magnetic separator | North Mine congregation into a congregation from Shenyang North mine equipment Limited. Shenyang North Mine Zhongcheng equipment Limited (sybkzc.com) (www.sybkzcjq.com) strong, credible, in Shenyang, Liaoning province machining industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the public into North mine into the brilliant and you work for a better future! |
Admin>>>
You are the 25945 visitor
Copyright © GuangDong ICP No. 10089450, Shenyang North Mine Zhongcheng Machine Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 25945 visitor
Copyright © GuangDong ICP No. 10089450, Shenyang North Mine Zhongcheng Machine Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility